| |
|
Global law firm Allen & Overy appointed CBI to provide Infrastructure Design, Procurement & Implementation Managed on their recent London HQ at Spitalfields. CBI took full Design responsibility of; HVAC Calculations, Full CAD drawings for low level cabling and high level cabling, Cross Connection frame layout, Floor Void recommendations, Cabinet layout and Tender Specification for ITT. After the selection of successful integrator; CBI provided Allen & Overy with Site Implementation throughout the lifespan of Allen & Overy's relocation of 1,700 London staff. |
|